We're carrying too much space across the Americas portfolio — 132 sites, most on legacy leases. Where should we consolidate or exit, and what's the ten-year cost impact? Show me your work.
✓ Thought for 14s
Good one to dig into. I read the current lease state across all 130 leased sites — term, break options, renewal options and restoration obligations — then tied it to the T12 operating statements before modeling anything.
✓ Read 214 documents · Americas Portfolio / leases
✓ Queried semantic model · 3 tools
Two things stand out before I even model exits: utilization sits at 28% against a 1:1 legacy design, and the portfolio is ~$34.7M below market, concentrated in the leases that expire first.
High confidence
verify ↗
And the rent isn't the whole cost. Fully loaded, occupancy runs about $604M a year — rent is only ~62% of it once opex, taxes, insurance and amortized fit-out are in. Here's the rationalization view; every figure traces back to a lease clause or a T12 line.
▤
Rationalization dashboard — Americas Portfolio
4 KPIs · exit vs renew NPV · $6.0M value identified
View ↓
If we blend-and-extend Gold River instead of exiting, what happens in cash and in P&L?
Blend-and-extend holds the space, resets rent toward market, and defers the 2027 exposure. In cash it comes out about $0.7M cheaper over ten years than a straight renewal, because Gold River #5302 carries a fixed-rate renewal option roughly $18/RSF below market. Under IFRS 16 it remeasures the lease liability by about $2.4M — cheaper in cash, but it adds P&L volatility in year one.
Verified vs lease §4
▦ Gold River — Lease #5302.pdf · §4 renewal option
▦ Americas_TCO_Stack.xlsx
And what would a full exit of Sunrise Gold #6 actually cost?
Cost to exit is more than the rent you stop paying. All-in it's about $4.1M — $2.6M residual lease liability, $0.9M decommissioning and restoration to warm shell, $0.4M write-off of unamortized fit-out, and $0.2M in early-termination penalties. Even so, exiting nets +$3.4M over ten years against holding it near-empty at 28% use.
Modeled — 2 inputs estimated
Where's the single biggest risk?
The 2027 expiry cliff — 20 leases and $48.9M of rent reach expiry in one year, the largest by far. At 9–12 month notice windows the runway is already short. I've flagged it in Signals and staged options for each.
Net recommendation: exit Sunrise Gold #6 at expiry, blend-and-extend Gold River before the below-market option lapses, and lock the two 2027 anchor renewals now. Modeled ten-year impact is $6.0M. Want me to draft the board-ready recommendation memo, or open the Composer to build the deck?
▤ Rationalization dashboard — Americas Portfolio every figure traces to source · reconciled vs T12
Annual rent
$375.9M
8.36M RSF · trace ↗
Utilization
28%
vs 1:1 legacy · trace ↗
Below market
$34.7M
held to renewal · trace ↗
Value identified
$6.0M
across 3 actions · trace ↗
The 36-month exposure
Rent reaching expiry by year — where attention has to go
Exit vs renew — 10-yr NPV
Modeled impact of each recommended action
Recommended actions
Each row is a decision the data implies — click a flag to open the lease behind it
| Asset / suite | Tenant | RSF | Action | 10-yr NPV impact | Flag |
| Skyway #7516 | Delta Logistics | 4,800 | Downsize | +$1.9M | OpEx variance |
| Gold River #5302 | River Machinery Co. | 1,125 | Renew & blend | +$0.7M | Below-market renewal |
| Sunrise Gold #6 | Horizon Packaging | 6,960 | Exit at expiry | +$3.4M | $6,708 balance |
| Skyway #7517 | ABC Foods | 4,800 | Hold / lock 2027 | — | Clean |